MEL Management for Part 135: From MMEL to OpSpec D095 Approval

How to develop, approve, and manage your Minimum Equipment List for daily dispatch compliance.

Navlyt Editorial TeamNavlyt Editorial TeamNavlytPublished 4/4/2026Updated 4/7/20269 min read
Share: LinkedIn X
MEL Management for Part 135: From MMEL to OpSpec D095 Approval

What is a MEL and why it matters for dispatch

A Minimum Equipment List allows operators to dispatch aircraft with certain inoperative equipment under defined conditions. Without an approved MEL, any inoperative item grounds the aircraft until repaired.

Your MEL is derived from the Master MEL (MMEL) published by the FAA for each aircraft type. You can be more restrictive than the MMEL but never less restrictive.

14 CFR 91.213; 14 CFR 135.179

Developing your operator-specific MEL

Start with the current MMEL for each aircraft type in your fleet. Review each item against your operational profile — routes, weather minimums, passenger configuration, and mission types. Your MEL should reflect how you actually operate.

Common customizations include restricting dispatch with inoperative weather radar for IFR-only operations, removing items not installed on your specific aircraft configuration, and adding operational limitations beyond MMEL minimums.

Getting OpSpec D095 approval from your FSDO

Submit your MEL package to your Principal Operations Inspector (POI). The package should include your operator MEL document, a compliance matrix showing how each item traces to the MMEL, crew training documentation on MEL dispatch procedures, and maintenance procedures for deferred items.

Approval typically takes 30-90 days. Plan ahead — operating without an approved MEL means any equipment deficiency grounds the aircraft.

Tip

Schedule a pre-submission meeting with your POI to discuss your MEL approach. This reduces revision cycles significantly.

Daily MEL tracking and deferred maintenance

Every MEL item has a repair interval category (A, B, C, or D). Category A items must be repaired within the time specified in the MEL. Category B items within 3 calendar days. Category C within 10 calendar days. Category D within 120 calendar days.

Track every open MEL item with date deferred, repair interval deadline, and assigned maintenance provider. A missed MEL deadline is an airworthiness violation — not a paperwork issue.

Cross-reference MEL status with your trip schedule in Navlyt TripDesk to prevent dispatching aircraft with expired deferrals.

Compliance warning

Dispatching an aircraft with a MEL item past its repair interval is an airworthiness violation under 14 CFR 135.179.

Common MEL audit findings

Using a MEL that references an outdated MMEL revision. Your operator MEL must be updated when the MMEL is revised.

Missing placards or operational limitations required by the MEL item. Every deferred item has associated crew awareness requirements.

Inadequate maintenance documentation for deferred items — the deferral log should show who deferred, when, the repair interval, and any operational limitations.

Navlyt tracks this automatically

Turn recurring compliance work into automated tasks and evidence trails.

Start Free Trial

Key takeaways

  • Your operator MEL must trace to the current MMEL revision.
  • OpSpec D095 approval requires MEL document, compliance matrix, and training evidence.
  • Track every MEL deferral with repair interval deadlines — missed deadlines are airworthiness violations.
  • Update your MEL when the MMEL is revised and when your fleet configuration changes.

Author

Navlyt Editorial Team

Navlyt Editorial Team

Navlyt

Written by the Navlyt team. Guides reference the specific regulations they discuss and are general information, not legal or regulatory advice — confirm requirements for your operation with your FSDO or compliance officer.

Was this helpful?

Stay ahead of regulatory changes

Stay ahead of regulatory changes and compliance deadlines.

No spam. Unsubscribe anytime.

Related posts