EFB Compliance for Part 135: Getting OpSpec A061 Approval
How to formally authorize your iPads and EFBs under FAA OpSpec A061 — and avoid the most common audit finding.
EFB classifications and what requires authorization
Type A EFBs are portable devices (like iPads) not mounted to the aircraft. Type B EFBs are portable but mounted. Type C EFBs are installed avionics. Most Part 135 operators use Type A or B with apps like ForeFlight.
Any EFB used to replace required paper documents (charts, manuals, performance calculations) during flight operations requires OpSpec A061 authorization. Using an iPad for reference is one thing — using it as your primary navigation chart source requires formal approval.
AC 120-76E; 14 CFR 135.144
Common EFB audit findings
Operating with EFBs as primary chart/manual source without OpSpec A061 — this is the most common finding and it is immediately actionable by inspectors.
Missing backup procedures for EFB failure during flight. Your GOM must address what happens when the iPad battery dies, the app crashes, or the device is damaged.
Inadequate crew training documentation. Every pilot must complete EFB training before using the device operationally, and recurrent training must address updates and changes.
Compliance warning
Using an EFB as a primary navigation chart source without OpSpec A061 authorization can result in a finding that affects your operational authority.
EFB program best practices
Standardize on one device model and one app suite across your fleet. Mixed configurations increase training burden and failure modes.
Carry paper backup charts for all planned routes. Even with OpSpec A061, having paper charts available demonstrates operational maturity and provides genuine safety margin.
Document app update procedures — when ForeFlight or Jeppesen pushes an update, your EFB program should have a process for validating the update before operational use.
Navlyt tracks this automatically
Turn recurring compliance work into automated tasks and evidence trails.
Start Free TrialKey takeaways
- Any EFB replacing required paper documents needs OpSpec A061 authorization.
- Submit your EFB package 60-120 days before planned operational use.
- Missing EFB authorization is one of the most common Part 135 audit findings.
- Backup procedures for EFB failure must be in your GOM and trained.
- Standardize devices and apps across your fleet.
Author
Navlyt Editorial Team
Navlyt
Written by the Navlyt team. Guides reference the specific regulations they discuss and are general information, not legal or regulatory advice — confirm requirements for your operation with your FSDO or compliance officer.
Was this helpful?
Stay ahead of regulatory changes
Stay ahead of regulatory changes and compliance deadlines.
Related posts
The Complete Part 135 Compliance Checklist for Charter Operators (2026)
A complete checklist of FAA Part 135 compliance requirements for on-demand charter operators covering training, documentation, aircraft, and crew currency.
What Must Be in Your Aviation Operations Manual: FAA Part 135 Requirements
What the FAA requires in a Part 135 operations manual including required sections, revision controls, and practical version management.
FAA OpSpecs for Part 135 Operators: What They Mean and How to Stay Compliant
Understand FAA Part 135 OpSpecs in plain English: what each section authorizes, common mistakes, and how to build operational controls around them.